HowLongFor

How Long Does It Take to Get a Banner Permit?

Quick Answer

1–4 weeks in most cities. Banner permit approval depends on the display location, banner size, and whether it spans a public right-of-way or is mounted on private property.

Typical Duration

1 week4 weeks

Quick Answer

A banner permit typically takes 1–4 weeks to obtain, though some municipalities offer expedited processing in as little as 3–5 business days for straightforward applications.

What Is a Banner Permit?

A banner permit grants authorization to display a temporary banner on public or private property. Cities regulate banners to manage visual clutter, ensure structural safety (especially for banners spanning roadways), and maintain aesthetic standards. Whether you are promoting a community event, advertising a grand opening, or displaying a seasonal message, most jurisdictions require a permit.

Timeline Breakdown

StepDuration
Application preparation1–2 days
Staff review3–10 business days
Public works/engineering review (if over roadway)1–2 weeks
Permit issuance1–3 business days
Total1–4 weeks

Types of Banner Permits

Street Banners (Over Public Right-of-Way)

Banners that span a street or are attached to light poles typically require the most rigorous review. Cities often limit these to government entities, nonprofits, or approved community organizations. Expect the longer end of the timeline (3–4 weeks) because engineering review is usually required to ensure wind load and structural safety standards are met.

Building-Mounted Banners

Banners attached to the facade of a commercial building generally have a simpler approval process. Many cities treat these similarly to temporary sign permits and can approve them within 1–2 weeks.

Event Banners on Private Property

Temporary banners for events on private property may still require a permit but usually face the least scrutiny. Processing times of 1–2 weeks are common.

Factors Affecting Approval Time

Banner Location and Size

Larger banners and those in high-visibility or high-traffic areas receive more scrutiny. Banners exceeding typical size limits (often 3 feet by 8 feet for building-mounted, or 30 inches by 96 inches for streetlight pole banners) may require a variance.

Duration of Display

Most cities limit banner display to 30–90 days. If you request a longer display period, additional review or a different permit category may be needed.

Permit Fee

Fees vary widely, from $25 for a simple private-property banner to $200 or more for street-spanning installations. Some cities waive fees for nonprofit or community events.

Tips for Faster Approval

  1. Apply at least 4 weeks before your event to build in buffer time.
  2. Provide exact dimensions, materials, and installation details on your application.
  3. Include a site photo or diagram showing the proposed banner location.
  4. Contact the permitting office before applying to confirm which permit type you need.

Bottom Line

Most banner permits are approved within 1–4 weeks. Street-spanning banners take longer due to engineering review, while simpler building or property banners can be approved faster. Apply early and submit a complete application to avoid delays.

Sources

How long did it take you?

week(s)

Was this article helpful?