How Long Does It Take to Get a Curb Cut Permit?

By the HowLongFor Editorial Team

Quick Answer

2–8 weeks on average. Most municipalities require a curb cut permit for driveway apron access, with review times varying by city workload and whether engineering review is needed.

Typical Duration

2 weeks8 weeks

Step-by-Step Timeline

1
Prepare the application with site plan, survey, and proof of ownership1 day – 3 days
2
City plan review of curb cut dimensions, drainage, and safety1 week – 4 weeks
3
Engineering or utility review if the site is near a major road or utility corridor1 week – 3 weeks
4
Permit issuance1 day – 5 days

Quick Answer

Getting a curb cut permit typically takes 2–8 weeks, depending on your municipality's permitting process, current backlog, and whether your project requires additional engineering or utility reviews.

What Is a Curb Cut Permit?

A curb cut permit authorizes you to modify the public curb and sidewalk to create a driveway apron or vehicle access point. Because this work affects public infrastructure, nearly every city and county requires a permit before any cutting begins. The permit ensures your new driveway entrance meets local standards for drainage, pedestrian safety, and ADA compliance.

Typical Timeline by Phase

PhaseDuration
Application preparation1–3 days
City plan review1–4 weeks
Engineering/utility review1–3 weeks (if required)
Permit issuance1–5 business days
Total2–8 weeks

Factors That Affect Timing

Municipality Size and Backlog

Smaller towns may process curb cut permits in as little as 1–2 weeks, while major cities like New York, Chicago, or Los Angeles can take 4–8 weeks or longer due to higher application volumes and more complex review processes.

Location-Specific Requirements

If your property sits near a major road, intersection, or utility corridor, additional reviews from the traffic engineering or utilities department may be required. These secondary reviews can add 1–3 weeks to the total timeline.

Completeness of Application

Incomplete applications are the most common cause of delays. Most jurisdictions require a site plan showing the proposed curb cut dimensions, a survey or plot plan, proof of property ownership, and the applicable fee (typically $50–$500).

Seasonal Demand

Spring and summer months tend to have heavier permit volumes as homeowners start construction projects, which can extend review times by 1–2 weeks compared to fall and winter submissions.

How to Speed Up the Process

  1. Call the permitting office first to confirm exact requirements before submitting.
  2. Submit a complete application with all required drawings and documents.
  3. Hire a licensed contractor familiar with local requirements, as they often know exactly what reviewers look for.
  4. Check for online submission options, which many cities now offer and which can shave days off the process.

Common Reasons for Denial

Permits can be denied if the proposed curb cut is too close to an intersection, fire hydrant, or utility access point. Sight-line obstructions and drainage concerns are also common issues. If denied, you may need to revise your plans and resubmit, adding another 2–4 weeks.

Bottom Line

Budget 2–8 weeks for a curb cut permit, and start the application process well before your planned construction date. The single best way to avoid delays is submitting a thorough, complete application on the first attempt.

Pro Tips

Call the permitting office before submitting to confirm exact requirements.

HowLongFor research

Submit a complete application with all required drawings and documents to avoid the most common delay.

HowLongFor research

Use online submission where offered — it can shave days off the process.

HowLongFor research

Quick Facts

A curb cut permit is required because the work modifies public curb and sidewalk infrastructure.

Source: NYC Department of Transportation

New driveway aprons must meet ADA standards for pedestrian access across the sidewalk.

Source: NYC Department of Transportation

Applications are commonly denied when the proposed curb cut is too close to an intersection, fire hydrant, or utility access point.

Source: City of Los Angeles Bureau of Engineering

Estimated Cost

$50$500

Permit fee varies by municipality; a denial and resubmission can add 2-4 weeks and additional review.